![]() Solid Waste Section
|
![]() Emergency/Disaster Debris Site Closure GuidanceClosure should be accomplished within six (6) months of initial site approval. Once a site is no longer needed, it should be closed in accordance with the following guidelines. Closure is not considered complete until the following occurs: Material Removal1. All processed and unprocessed vegetative material and inert debris shall be removed to a properly approved solid waste management site. 2. Tires must be disposed of at a scrap tire collection/processing facility; white goods and other metal scrap should be separated for recycling. 3. Ash from approved air curtain burning operations shall be removed and disposed (completely cooled) at a properly permitted municipal solid waste landfill or land applied in accordance with the Division guidelines (see Page 21). 4. All other materials (e.g. unrecoverable metals, insulation, wall board, plastics, roofing material, painted wood, and other material from demolished buildings) that is not inert debris (see #1 above) as well as inert debris that is mixed with such materials shall be removed to a properly permitted C&D recycling facility, C&D landfill, or municipal solid waste landfill. Stabilization Agency Approval Site Reapproval
|